Manufacturing Plant I Howrah

Plant 1 — Howrah Unit

Sri Ram Hanuman Complex, Ranihati, Amta Road, Howrah – 711322

GSTIN: 19AADCS8376B1Z5

Plant Area 5.73 Acres
Annual Capacity 14,400 MT Aluminium Alloy Ingots

Our flagship Howrah facility features eco-friendly Skelner and crucible furnaces and automatic ingot casting lines for tailor-made wheel and piston alloys.

Spectrometer 1 - Plant 1
Spectrometer 1
Spectrometer 2 - Plant 1
Spectrometer 2

Plant 2 — Coimbatore Unit

S.F.No. 176/2, 3, Suluk Taluk, Pappampatti Village, Chinnakuyili Petrol Bunk Cut Road, Coimbatore – 641016

GSTIN: 33AADCS8376B1ZF

Plant Area 2.47 Acres
Annual Capacity 7,200 MT Aluminium Alloy Ingots

Strategic Southern manufacturing hub catering to automotive and electrical component foundries across South India with rapid delivery cycles and ISO 14001 / ISO 45001 EMS safety accreditations.

Manufacturing Plant II Coimbatore
PLANT ASSETS

Machinery & Equipment

Advanced furnaces, spectro-analysers, dross recovery systems, and material handling fleet across our units.

3 Skelner Furnaces

2 in Plant 1, 1 in Plant 2

6 Crucible Furnaces

4 in Plant 1, 2 in Plant 2

3 Spectro Meters

2 in Plant 1, 1 in Plant 2

2 Hot Dross Machines

1 Hot Dross Processing Machine in each Plant

2 Bailing Press Machines

Plant 1

2 Dross Processing Units

Ball Mill Machine, Pulverizer, Magnetic Separator - 1 Unit in each plant

Die Casting Unit

Electric Furnace, Band Saw Machine, Abrasive Belt Grinding Machine - Plant 1

4 Forklifts

3 in Plant 1, 1 in Plant 2

Telehandler

1 in Plant 1

STEP-BY-STEP MANUFACTURING

Aluminium Alloy Ingot Manufacturing & Delivery Process

Comprehensive 19-step quality assurance workflow from raw material purchasing to final delivery.

1

Raw material (RM) purchasing

All scraps are purchased by our experts after thorough assessment

2

Sorting of RM

Our group of expert sorters segregate the lot manually and remove all non metallic/non aluminium material to create a homogeneous batch of scrap

3

Testing RM

Random sampling of the segregated RM is done for quality control

4

Sorting out batch mix

Our production team selects and forms a batch mix of different types of scraps suitable for a particular grade

5

Charging RM in furnace

The selected batch is then transferred into our furnaces

6

Drossing

After the material is melted, all the ash and residue is scooped out of the furnace

7

1st Sample

A sample of the molten metal is tested in our lab in the Spectro meter

8

Alloying

After sampling, our production manager selects further raw material for alloying and correction

9

Drossing

Again the ash and residue is scooped out of the furnace

10

Metal Treatment

Nitrogen/Argon degassing along with other treatment is done for removing porosity and grain refinement

11

Final Sample

Another sample is drawn from the batch and tested to check whether the metal is in the range of the particular grade. If not, corrective raw material is further charged

12

Pouring

After the Lab incharge approves the final sample, the molten metal is casted in our moulds

13

Skimming

While pouring, any residue on the surface of the mould is scooped out

14

Grade and Batch No. Embossing

While the molten metal is semi hard, batch no and grade is embossed on the ingot

15

Stacking of Ingots

After pouring is completed, all the ingots are stacked in piles

16

Labeling

The piles are then labelled and colour coded according to the customers specifications

17

Final testing

Random samples of ingots are selected from the piles and tested again for quality control

18

Packaging

The piles are then packed for delivery

19

Delivery

All the piles are loaded in vehicles and released for delivery.